FieldTrack
FieldTrack
by Axiom Advisory
Construction Technology

Material movement.Tracked on site.

FieldTrack turns deliveries, plant movements, and load records into structured operational data — reconciled before the day ends.

01
Live site map
Log every From → To movement straight off the grid.
02
Reconciled exports
Tally sheets, reports, and audit trail ready in seconds.
03
Locked-in projects
Map and grid revisions saved for the project duration.
FieldTrack
FieldTrack
by Axiom Advisory

Enter your licence key

Activate to start logging movements straight away.

Don't have a key? Contact us →
admin@axiomadvisory.org

Project Name

Project Number - Project Address

Today

Total Volume Moved
0 m³
Total Movements
0
Plant Used
0
Most Active Zone
-

Site Weather

Fetching forecast…

Productivity KPIs (Today)

Tonnes/Hour
avg across shift
m³/Hour
avg across shift
Active Hours
operator hours logged
Cost Today
plant + operator

Volume by Material Type (Today)

No movements logged today.

Volume by Plant (Today)

No movements logged today.

Daily Volume — Last 14 Days

Recent Movements

No movements logged yet.

Site Grid Map

No site image uploaded yet. Upload your aerial/drawing, then click two cells (From → To) to log a movement.
From: - To: -

Lock Map for Project Duration

Once the grid is set up correctly, lock it in for the duration of the project. The current map + grid is saved as a revision. Locking can be undone later if the layout needs to change - a new revision is recorded each time it's re-locked.

Operator Tally Sheet

Select the machine, then print. Operators fill in date, times, and tally by hand.

Project
Daily Material Movement Tally Sheet  ·  DKT:
Date
Operator Name
Machine
Start Time
Finish Time
Material Tally (mark each load) From Zone To Zone Total Loads

Log Movements

1Upload Tally Sheet(s)
Drag & drop tally sheet photos or PDFs here, or click to upload
Supports multiple files — each will be scanned separately
2Docket Details
Operator Hours
Material Movements on this Sheet
MaterialFromToLoadsVol (m³)Tonnage (t)
Total Loads
-
Total Volume (m³)
-
Total Tonnage (t)
-

Movement Log

DateDocketOperatorHoursFromTo MaterialPlantVolume (m³)FlagsNotes

Audit Trail

Every edit, delete and override — with user and timestamp
No changes recorded yet.

Add Document

Drag & drop file here, or click to browse
PDF, images, Word docs — max 20 MB

Documents

No documents added yet.

Plant Cost Summary

Machine hours × hourly rate from Settings. Set rates under Settings → Plant & Machines.

No movements logged yet.

Cost per Zone

Cumulative plant + operator cost allocated to each zone as the source of movement.

No cost data yet.

Equipment Utilisation by Material

Volume (m³) and tonnage each machine processed per material type.

PlantMaterialMovementsVolume (m³)Tonnage (t)Hours
No data yet.

Operator Hours Log

DateDocketOperatorPlantStartFinishHoursDaysMachine CostOperator CostTotal Cost

Export & Reports

Filter by date range (leave blank for all records), then choose your export format.

Site Map

No map uploaded

Movement Summary

DateDocketMaterialFromTo LoadsVol m³TonnesPlant
No data.

Export

ZIP Report

Excel summary + site grid map, bundled as a single ZIP file.

PDF Report

Formatted PDF with project details, site map and full movement table.

Excel Export

Movement log as an .xlsx spreadsheet with summary sheet and cost breakdown.

CSV Export

Raw movement log as a CSV — works with Excel, Sheets, or any analysis tool.

Survey Reconciliation

Record initial survey per zone. Movement logs track material moved. Enter a progressive survey to calculate variance.

Step 1 — Initial Survey

Pick a zone and enter its starting volume at project commencement.

Step 2 — Progressive Survey

Enter surveyed volume for a specific zone to compare against expected.

Saved Reconciliations

No reconciliations saved yet.

Settings

Select a section to manage project configuration.

FLEET

Plant & Machines

Tonnage ratings, serial numbers and suppliers for the plant fleet on this project.

MATERIALS

Materials

Material types and bulk densities (t/m³), used to calculate load volumes.

DATA

Data Management

Export your data or clear the movement log for this project.

EXPORT

Project Completion Export

Export everything captured for this project into one ZIP file before archiving or closing out.

Plant & Machines

Plant fleet for this project — feeds the "Plant Used" dropdown in the Movement Log. Set a tonnage rating to see estimated load volume (m³) per material.

Materials

Material types for this project, with bulk density (t/m³). Density is used to estimate the cube (m³) a machine can carry based on its tonnage rating.

Data Management

Export your data for this project, or clear the movement log.

Project Completion Export

Export everything captured for this project — movement log, plant & materials setup, site map and grid, documents, and project details — into a single ZIP file. Use this when closing out the project.

Data Retention Disclaimer

By downloading this export, you take full responsibility for storing this project data for a minimum of seven (7) years in line with your record-keeping obligations. Once downloaded, FieldTrack accepts no liability for the storage, retention, loss, or security of this data going forward.